Landsnet’s control center logged operational disruptions in a legacy system. It was inefficient and overly complex.
The legacy system
The old system was a long form for every disruption.

Workshops
I ran workshops with Landsnet staff to map the functions and features the new system needed.


Wireframes and prototypes
From the workshops I drew wireframes. Then I made clickable prototypes.
I tested the prototypes with control-center staff and changed them after each round.


The design system
I built a design system: type, colour and interface elements.



The finished design

